Meter User's Manual
Refer to IMAGE 10 for an example of a properly crimped wire.
Step 6
Connect the wires to the Meter (IMAGE 11):
Step 7
Put back the cover panel of the home distribution box to cover the elec-
trical contacts. Be sure that no electrical contact can be touched.
Step 8
Power on the system by enabling power in the electrical panel. Remind
that the power supply of the Meter is provided by the Bridge Box (REF
CMB-01.1011)
Step 9
To finalize the installation, all tiko devices must be configured using the
installation app.
Device Operation
The operation of the Meter is subject to the control of the full system and operated by
the Data Center through the Gateway (M-Box). No user interaction is required.
To prevent the system from overheating, do not operate it in an area that
exceeds the maximum admitted ambient temperature of 55 °C!
tiko Energy Solutions AG
•
Example products are Vogt 440912.47 (16 mm
441015.47 (25 mm
TE Connectivity 2-966067-8 (25 mm
•
crimp the bootlaces only using a suitable crimping tool (IM-
AGE 9). Example products are: WAGO 206-1216 (up to
16 mm
2
) or WAGO 206-1225 (up to 25 mm
•
Connect the phase power source to the L
•
Connect the phase load to the L
•
Connect the neutral as reference to the N
Tighten all clamp screws with appropriate torque. Insuffi-
cient clamping force can result in high contact resistance
that leads to device heating and can result in a fire hazard.
Operation
English
2
), TE Connectivity 2-966067-6 (16 mm
2
).
2
).
clamp ❶.
in
clamp ❷.
out
clamp ❸.
Ref
IM-0007-0003 Rev. 6
6 / 44
2
), Vogt
2
),