Operation Test; Front Panel Explanations; Main Switch - Atlantis OnePower 841 Manuel Utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.7 Operation Test

Connect the UPS to the wall receptacle.
Push on the Main Switch to check the Green Line (
Connect your computer equipment with sockets of the UPS and pull off the
input power cable of the UPS from the wall receptacle to check if the Line (
) LED is flashing every 3 seconds. Meanwhile, please check if alarm
buzzer is beeping.
Try the field working condition by running some application programs on your
computer and repeating step.
Check if the UPS is initiated properly to support continuous operation.

1.8 Front Panel Explanations

On the front panel You can found 2 LED for an easy diagnostic.
LED

Main Switch

Plug the UPS into the wall outlet to charge the UPS for over 10
hours before using the UPS.
Information
To Control on/off the UPS when Utility is normal.
To enable "DC-Start" Function when Utility fails. (To
enable DC Start properly, you are recommended to
connect <80% output load with the UPS only). P.S.
Make sure the computer connected to the UPS is
switched on before enable the "DC-Start" function. You
are not recommended to add some other computer or
28
) LED is on.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Onepower 701

Table des Matières