FIGURE 3 - FASTENING WITH DRYWALL SCREWS
Note: Remove the protective film from the tile flange before fastening.
NOTE: To the Installer - Please remove all the shims from the Snap Fit extrusions of the unit prior to installation.
1.
The 3-piece Shower unit should be pre-assembled first prior to alcove installation. Pre-assemble the unit as close to the framing as
possible to minimize movement of the unit during installation. Assemble the unit by first placing the bottom section in position,
followed by the mid section and then the canopy. See Figure 5.
2.
Position the tub section first as shown in Figure 6.
3.
Apply the mildew resistant bathroom silicone caulking inside the snap fit extrusion throughout the entire length. This has to be
applied
to all six snap fit extrusions on the product. See Figure 7.
4.
Next, snap position the middle section carefully into the tub section. See Figures 8, 9 & 10.
5.
Lock the system by applying moderate pressure from the upper portion of the mid-section, lock with the back snap first then
followed by the two side snaps . When in locked position the two sections should align and fill the gap as shown in Figure 11. If there
is a gap at the seam, then unlock and adjust the section to ensure centering to minimize the gap.
6.
Repeat the same procedure to put the canopy or the upper portion in place. See Figure 12.
7.
A bead of mildew resistant bathroom silicone caulking should be applied to the back side of the top and bottom joint to form a
moisture barrier. See Figure 11.
8.
When fully assembled, carefully slide the unit into the frame by pushing the assembly at the bottom on the threshold. See arrows in
Figure 13.
9.
Should gaps be visible at top and or bottom seams, adjust the area by applying moderate force at the arrows shown in Figure 13.
10.
Fasten the unit into the framed alcove by the recessed 2" x 2" around the periphery of the opening as illustrated in
Figure 3, (2 vertical studs and 1 across the top).
11.
Drywall finish the framed alcove as shown in Figure 4.
12.
Follow the manual for all other installation procedures.
FIGURE 5
FIGURE 12
STUD
SHIM
SNAP-FIT SYSTEM ASSEMBLY INSTRUCTIONS
"Snap Fit" system
Can. Patent No. 1240072
Maintenance Free Overlap on 3-pc.
FIGURE 6
Apply silicone
caulking
FIGURE 9
COUNTER SINK
FIGURE 3A
FIGURE 3B
FIGURE 4 - DRYWALL FINISHING
SILICONE
FIGURE 7
FIGURE 10
FIGURE 11
FIGURE 8
FIGURE 13
2

Publicité

loading

Ce manuel est également adapté pour:

Madison 4Sh3l/rSh3ls/rsSh4l/rSh4ls/rsSh33l/r ... Afficher tout