Installation Layout; Preparatory Steps - DIMOEL ElectroDue Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Actuator
Blinker
Aerial
Key or digital selector
Safety ribbon (EN 12978)

PREPARATORY STEPS

The new series of actuadors MOOV, has been devised to serve gates up to 200 Kg with leaf up to 2,5 meters wide (look at the table
technical data). Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Hinges and pins are in optimum condition and properly greased.
• No obstacles are within the moving area.
• There is no friction with the ground or between the leaves.
• Your gate shall be equipped with central

INSTALLATION LAYOUT

cable 4 x 1 mm
2
cable 2 x 1,5 mm
2
cable RG-58
cable 2 x 1 mm
2
-
and side
stops, which are fundamental for the good system operation.
Internal photocells
External photocells
Control unit
28
cable 4 x 1 mm
2
(RX)
cable 2 x 1 mm
2
(TX)
cable 4 x 1 mm
2
(RX)
cable 2 x 1 mm
2
(TX)
cable 3 x 1,5 mm
2

Publicité

Table des Matières
loading

Produits Connexes pour DIMOEL ElectroDue

Ce manuel est également adapté pour:

Kit electro due

Table des Matières