2. Generalities
The equipments, in their different versions, are designed to be buried or semiburied. In
any case they come formed on 2 parts:
• Body: booth that lodges the filter, the pump, the valves and the optionals.
• Lid: with different shapes according to configuration, which is opened by means
of 2 hinges that come fixed to the body and holds itself by 1 or 2 bars according
to the measure of the lid.
3. Installation
Prescriptions of assembly
Installation and assembly must be done by an authorized installer.
Installation must be realized in agreement with the safety procedure for swimming
pools, especially the norm IN 60364-7-702 and the particulares of every application.
For the safety of the users, the equipment must be installed imperatively minimum at
3'5m from the swimming pool, according to prescriptions of the regulation. If it is
installed at less than 3'5m from the swimming pool, it is prohibited to use the equipment
when the swimming pool is in use.
Installation of the equipment
To make a sure installation, please proceed as follows:
1. Make the excavation according to the measures of the equipment. Smooth the
bottom and make a base of concrete, foreseeing the space in which the
drainage must be placed.
2. 2.-Electrical feeding: perforate the equipment at the side that is wished to come
with the electrical feeding. Please, protect the cable with a flexible hose (not
included) and assure it with a nut (included).
3. Prepare the drainig and place the equipment.
4. Prepare the area for the installation of pipelines. Installation must be done by
poor concrete preferably (mix based on 20 % of cement and 80 % of sand). The
level of concrete must come rightly below the pipelines of the top part.