Attach upper handle

(See Figure 6,7)
1 . Slide the upper handle down over the lower handle and
align the holes . Orient upper handle so clutch lever is
below handle .
2 . Insert the saddle bolts into the holes as shown and
secure with flat washers and handle knobs.
3 . Tighten the handle knobs securely .
4 . Using one cable tie, secure the control cable to
the handle as shown .
Install the outside tine shields
1 . Each outside tine shield can be installed on either side
of the main tine shield .
2 . Place the outside tine shield underneath the main tine
shield and align the holes .
3 . Secure each outside tine shield to the main tine shield
with (3) M6 x 16 bolts washers and lock nuts .
Install the rope guide
1 . Install the rope guide into the right hand section of
the upper handle as shown . Install locknut and tighten
securely . Pull engine rope and route through
the guide .
Questions? Call Toll Free at 1-800-737-2112
(See Figure 8)
(See Figure 9)
Saddle
Bolts
Handle
Knobs
ENG - 10
Copyright © 2018 MAT Engine Technologies, LLC
Figure 6
Figure 7
Figure 8
Figure 9

Publicité

Table des Matières
loading

Table des Matières