Starting Up The Product Using A Magnet - Adenius R.F. LoRaWAN PULSE Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

LoRaWAN PULSE - Mode d'emploi / User guide version V1.5
Finish the assembly by locking the packing gland's nut in position
Packing gland nut

2.6. Starting up the product using a magnet

Once the product has been configured and its assembly has been finalised, the product is ready to be started up.
The start-up is carried out using a magnet which you place on the upper part of the product (cf. the diagram below). The magnet must be held
in position for at least 6 seconds so as to confirm the start-up of the product.
Once the LoRaWAN PULSE unit validates its start-up, iit immediately transmits status frames followed by a data frame (according the defined
periodicity).
NB 1: Once the LoRaWAN PULSE unit has started up, it cannot be switched off.
Position of the magnet for
starting up the product
Page
34
of 41

Publicité

Table des Matières
loading

Table des Matières