Mirolin BD 44 Manuel D'utilisation page 4

La porte de douche monobloc sans plafonnier
Masquer les pouces Voir aussi pour BD 44:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 1: Remove the lid from box.
Remove packaging and inspect all door components
thoroughly before installation. Check to ensure all the
hardware parts are in the package.
STEP 3: Place Plastic Jamb (B2) ½ " inside from
the edge of threshold.
STEP 5: Pre-drill holes in Plastic Jamb (B2) using
1/8" drill bit and screw to walls with # 6 - 1" PH
screws (B15).
STEP 2: Mark Plastic Jamb (B2) to match holes
in the Wall Jamb (B1).
Insert and line up blocks with marked locations.
STEP 4: Ensure the plastic Wall Jamb (B2)
is plumb with level.
STEP 6: Insert Tracking Guides (B9) into the
Sill (B10).
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bd 56

Table des Matières