NOTES
1 Foundation or floor must be level, and support all feet equally. If
necessary, shim or grout the fourth foot.
2 Foundation bolts should project thru nuts a minimum of 13mm
[0.50"] to allow for levelling.
3 Allow a minimum clearance of 1100mm [42"] on the front and
920mm [36"] on the top, left, right and the rear of the package for proper
air circulation and serviceability.
4 Approximate package weight: 475 KG. (1045 LBS)
NOTE
All dimensions are in millimetres (inches) unless otherwise stated.
Ensure that the correct fork lift truck slots or marked lifting points are
used whenever the machine is lifted or transported.
UNPACKING
The compressor will normally be delivered with a polythene cover.
If a knife has to be used to remove this cover ensure that the exterior
paintwork of the compressor is not damaged.
http://air.ingersollrand.com
INSTALLATION / HANDLING
Remove shipping bolts on end panel.
Ensure that all transport and packing materials are discarded in a
manner prescribed by local codes.
DRYER INSTALLATION
Do not connect condensate drains common to other pressurised
drain lines in a closed circuit. Make sure the outflow from the
condensate drains is unimpeded. Connect the condensate piping in
such a way to ensure that sound levels are kept to a minimum during
drainage.
Ensure that all condensate is disposed of in a responsible manner, in
accordance with local norms concerning environmental protection.
The ambient air around the dryer and compressor must not contain
solid or gaseous contaminants. All compressed and condensed gases
can generate acids or chemical products which may damage the
compressor or components inside the dryer.
Take particular care with sulphur, ammonia, chlorine and installations
in marine environments. For further advice or assistance consult your
local Ingersoll Rand representative.