Perform Network Test; Factory Reset; Trouble Shooting - Danfoss Link PR Plug-In Relay Guide D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16
Installation Guide

Perform network test

When the Danfoss Link™ PR has been
added to the Danfoss Link™ CC Central
Controller, a network test should be
performed .
For more information on network tests,
see the Danfoss Link™ CC instruction
manual:
Configuration 8:
Perform network test.

Factory reset

Trouble shooting

Green LED ON
Red LED ON
Green LED fast flash
Red LED short flash
8
Danfoss Link™ PR
1 . Disconnect the unit to cut off power .
Hold the install button down
while reconnecting power . Keep
pressing the install button until
the LED gives a red flash (approx .
5 seconds) .
Relay OFF/Standby
Relay ON/Heating
Inclusion or link test
Inclusion not OK
Link test not OK
VISGY45X
© Danfoss
04/2011

Publicité

Table des Matières
loading

Table des Matières