Solar BA327 Mode D'emploi page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GOOD & PASS The tested battery is good and capable of holding a charge.
GOOD & RECHARGE The tested battery is good but needs to be charged.
RECHARGE & RETEST The tested battery is discharged. The battery condition
cannot be determined until it is fully charged. Recharge and retest the battery.
BAD & REPLACE The tested battery cannot hold a charge. It should be
replaced immediately.
BAD CELL & REPLACE The tested battery has at least one short-circuited cell.
It should be replaced immediately.
LOAD ERROR The tested battery is larger than 2000 CCA or 200 AH. Or, the
clamps are not connected properly. Check battery connection. If connection
is incorrect, reconnect and retest. If connection is correct, charge the tested
battery to full charge and retest, ensuring that a proper connection is made. If the
reading is still the same, the battery should be replaced immediately.
Note: If this outcome is displayed, the operator is asked if any
accessories have been left on as a possible cause. If it is found that
accessories were left on, charge the tested battery and retest. If it is
determined that no accessories were left on, the battery should be
replaced.
11. Press "ENTER" to view the unique warranty code for the completed test.
This code will also appear on your printout if you choose to print your result
(see next step).
12. Press "ENTER" to go to the Print Option Screen. The tester will ask if you would
like to PRINT RESULT? Scroll to your preferred choice and press "ENTER". If
you chose YES, the printer will print results. If you chose NO, the tester will once
again return you to the Home Screen and once again display the battery's open
circuit voltage.
13. Remove the test leads from the battery posts after completion of testing, always
removing the negative (black) clamp first and then the positive (red) clamp.
System Testing: Starting and Charging System Tests
During this portion of the testing process, the tester will perform the following tests in
order:
• Starting System Cranking Test

Publicité

Table des Matières
loading

Produits Connexes pour Solar BA327

Table des Matières