Final Inspection - Transform SALEM QFK39BE Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation (continued)

FINAL INSPECTION

- Open your home's hot and cold water
supply valves and carefully inspect all
connections for leaks .
- Move the valve handle (13) to the open
mixed position by turning it to the middle
and pulling it away from the faucet .
- Run the water uninterrupted for about one
minute to remove any residue from the
lines and inspect all connections for leaks
once again .
QFK39BE
8
Valve Handle (13)
Fig. 6

Publicité

Table des Matières
loading

Table des Matières