Klarstein 10031432 Mode D'emploi page 69

Climatiseur split
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Step 8: bind up pipe
1.
Bind up the connection pipe, power cord and drain hose with the band.
indoor unit
2. Reserve a certain length of drain hose and
power cord for installation when binding
them. When binding to a certain degree,
separate the indoor power and then separate
the drain hose.
3. Bind them evenly.
4. The liquid pipe and gas pipe should be bound
separately at the end.
Notes:
• The power cord and control wire can't be crossed or winding.
• The drain hose should be bound at the bottom.
69
indoor and
outdoor power cord
gas
pipe
liquid pipe
band
drain hose
connection pipe
indoor power cord
drain hose
band

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10031433

Table des Matières