Tools Required; Parts List - Weather Guard 246-3-02 Manuel D'installation

Masquer les pouces Voir aussi pour 246-3-02:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Approximate installation time: 42 minutes per unit (0.7 hours) depending on truck equipment installation experience.
1/2" Open or Box End Wrench (2)
Electric Drill
1/2" & 3/8" Drill Bits
• 1 - Hi-Side (or Super Hi-Side) Box
NOTE: Depending on your application you may end up with extra hardware after installation is complete.
INSTALLATION TIME

TOOLS REQUIRED

Carpenters Square
Utility Knife or Scissors
Tape

PARTS LIST

• 2 - Legs
BOLT KIT 32-0028
DESCRIPTION
1-3/4" Round Cap Plug
5/16" Lock Washer
5/16" Flat Washers
5/16-18 Blind Fastener
Installation Tool
5/16-18 x 2-1/4" Black Oxide Bolt
5/16-18 x 1-1/4" Hex Bolt
5/16-18 x 1" Hex Bolt
5/16-18 Nylon Lock Nut
"J" Bolt
Plastic Retaining Washer
Fender Washer
2
9/16" Open or Box End Wrench
Measuring Tape/Ruler
Pencil/Sharpie
• 2 - Mounting Pads (20" and/or 27" and/or 45")
QTY.
1
8
14
4
1
1
4
4
12
4
4
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

396-5-02

Table des Matières