Regalo 1230 Manuel Du Propriétaire page 9

Masquer les pouces Voir aussi pour 1230:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 3
Slide a second plastic wall spacer
from the top of the mounted level pole
downward until the middle pre-drilled
screw hole aligns with the hole in the
second plastic wall spacer. Using the
built in bubble level, ensure that the
mounted level pole is straight and level
before using a 2.5" wall mount screw
to fasten both components to the wall.
Do not fully tighten the wall mount
screw yet.
STEP 4
Repeat STEP 3, aligning a third plastic wall spacer with the top pre-drilled
hole in the mounted level pole. Now, go back and fully tighten all three wall
mount screws. Repeat STEPS 1 – 4 if you are installing the second mounted
level pole to a wall with a baseboard. If the opposing wall has no baseboard,
see page 7. If fastening the second mounted level pole to a round banister,
see Option B1 on page 10 or Option B2 on page 12 for a square banister.
STEP 5
Once both mounted level poles are securely mounted on both sides of the
opening, see page 14.
English
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1230ca12351235ca12401240ca

Table des Matières