Option A1: Mounting to a wall without a baseboard
NOTE: When fastening the mounted level poles to your wall make sure that
you are fastening the screws into a stud in the wall, OR that you use the
appropriate wall anchors. Consult a professional if you are unsure about
safely installing your mounted level poles.
STEP 1
Place one of the mounted level poles up
against the wall so that it is level and straight.
The bottom of the mounted level pole should
be resting on the floor. Use the built in
bubble level to ensure proper placement.
STEP 2
Use three of the 1.5" wall mount
screws to fasten the mounted level
pole to the wall through three of
the pre-drilled holes. If you are
fastening your mounted level pole
to drywall or similar material, ensure
you are making contact with a
supporting stud behind the drywall.
STEP 3
Repeat STEPS 1 – 2 if installing the second mounted level pole to an opposing
wall without a baseboard. If the opposing wall has a baseboard, see page 8. If
fastening the second mounted level pole to a round banister, see page 10. For a
square banister, see page 12.
STEP 4
Once both mounted level poles are securely mounted on both sides of the
opening, see page 14.
BUBBLE LEVEL
MOUNTED LEVEL
POLE
STUD
DRYWALL
English
7