Safety and operating instructions

Every day

Clean and inspect the machine and its functions
each day before start working.
Conduct a general inspection for leaks, damage,
and wear.
Change damaged parts immediately.
Replace worn components in good time.
Make sure that all the attached and related
equipment, such as hoses and flow dividers are
properly maintained.
Clean the quick-release couplings before use.

Every month

Check torque tightness of all fasteners.
Check the bush in nose casting for wear or
damage.
Check wear on the shank of the ramming tool.
Spray the trigger and all contact surfaces with
suitable lubricant, applies to hydraulic post driver
with trigger control valve only.

Periodic maintenance

After each operating period of approximately 600
impact hours or yearly the machine must be
dismantled and all parts be cleaned and checked.
This work must be performed by authorized staff,
trained for this task.

Storage

Disconnect the machine's hoses from the power
source, see "Start and stop".
Make sure that the machine is properly cleaned
before storage.
Always store the machine in a dry place.

Disposal

A used machine must be treated and scrapped in
such a way that the greatest possible portion of the
material can be recycled and any negative influence
on the environment is kept as low as possible.
16
Before a used machine is scrapped it must be
emptied and cleaned from all hydraulic oil. The
remaining hydraulic oil must be deposited and any
negative influence on the environment is to be kept
as low as possible.
© 2010 Atlas Copco Construction Tools AB | No. 3392 5036 90 | 2010-04-15
LPD LPD-T, LPD-RV
Original instructions

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lpd-tLpd-rv

Table des Matières