Water Hose Installation - Yamaha YP20G Manuel Du Propriétaire

Masquer les pouces Voir aussi pour YP20G:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

0˚C
25˚C
å YAMALUBE 4 (10W-40)
ç SAE #20
32˚F
80˚F
2
Recommended engine oil:
å YAMALUBE 4 (10W-40),
∫ SAE #30
ç SAE #20
∂ SAE 10W
Recommended engine oil grade:
API Service SE type or higher
Engine oil quantity:
0.6 L (0.63 US qt, 0.53 Imp qt)

Water hose installation

1. Install the hose joint to the pump.
1
1 Hose joint
NOTICE
When installing the joint to the pump, be sure the
gasket is in place.
2. Connect the hoses on the joints with clamp.
3. Connect the strainer on the inlet hose end.
2 Strainer
NOTICE
9 Be sure the hoses are installed securely or air
leak will occur and water will not be drawn up.
9 Be sure the strainer is installed or pump dam-
age may occur.
NOTICE
Install the strainer
A) 50 mm (2 in) suction port diameter for YP20G
or
B) 80 mm (3 in) suction port diameter for YP30G
both with filtering perforations 8 mm (0.31 in) or
less in diameter.
SAE 10W-30 or 10W-40
– 9 –

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Yp30g

Table des Matières