Monument PLUMBLINE 3000 Serie Guide D'installation page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

System Setup (continued)
3
Connect brine line between the salt storage tank and
control valve using ⅜" tubing and parts included in
installation packaging. Hand tighten each nut, then
gently snug with wrench.
⅜"
Tubing
Connection
4
Confirm drain line flow control (DLFC) installation by
removing retainer clip and disassembling as shown. Apply
teflon tape to barbed drain adapter. Thread barbed drain
adapter into DLFC adapter. Reassemble DLFC assembly
and secure with retainer clip.
DLFC
Retainer Clip
13
DLFC Adapter
Barbed Drain Adapter

Publicité

Table des Matières
loading

Produits Connexes pour Monument PLUMBLINE 3000 Serie

Table des Matières