Product Description; Use And Operation - oneConcept 10028678 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1
Lid
2
Lid lock
3
On/Off knob
4
Handle
5
Power base
6
Kettle
7
Spout
It is recommended that operate the kettle several times following the below instruction and
discard off the water before fi rst use. This will remove the material or dust remained in the
appliance, which is caused by the manufacturing process.
1. Open the lid automatically by press down the Lid Knob and fi ll water into the kettle. Then repla-
ce the lid otherwise the kettle could not be cut off power automatically after water being boiled.
Caution: The fi lled water level must be between the "Max" and "Min" level as indicated
on the housing. Too less water will do damage to the heat element and if the water is
overfi lled, boiling water may be ejected.
2. Replace the kettle on the Power Base and connect to power supply. Position the kettle so
that the spout of kettle is facing away from you.
3. Press the switch and the blue LED light will be illuminated. And water begins to be heated
up. DO NOT open the lid while the water is boiling. When the water temperature is up to
40 °C, the LED light is blue color, 40-75 °C is purple color, 75-100 °C is red color.
Caution: Ensure that switch is clear of obstructions and the lid is fi rmly closed. The kettle
will not turn off if the switch is constrained or if the lid is left open.
4. Power will be cut off automatically and Switch will be back to "0" position once water has
been boiled. And the lamp will be off .
6

Product Description

Use and Operation

Publicité

Table des Matières
loading

Table des Matières