FLORABEST FTP 400 D3 Traduction Des Instructions D'origine page 9

Masquer les pouces Voir aussi pour FTP 400 D3:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Electrical safety:
Caution: to avoid accidents
and injuries from electric
shocks:
• After erection, the mains plug
must be freely accessible when
the equipment is in operation.
• Before operating your new
pump, have a specialist check:
- The earthing, the protective
multiple earthing; the re-
sidual current circuit break-
ing must be compliant with
the safety regulations of the
energy supply company and
function without fault,
- The protection of the electri-
cal plug connections from
the wet.
• If there is a risk of flooding,
fix the plug connections in an
area that is safe from flooding.
Risk of electric shock.
• Ensure that the mains voltage
matches the specifications on
the rating plate.
• The electrical installation shall
be according to national wir-
ing rules.
• Before each use, check the
equipment, cable and plug for
damage. Defective cables are
not to be repaired, but rather
replaced by new ones. Have
damage on your equipment
repaired by an authorised spe-
cialist.
• Do not pull the plug from the
socket by the cable. Protect the
cable from heat, oil and sharp
edges.
• Do not carry or fix the equip-
ment by the cable.
• Use only extension cables that
are protected from spray water
and designed for outdoor use.
Always fully unroll a cable
drum before use. Check the
cable for damage.
• Disconnect the mains plug from
the socket before all work on
the equipment, in case of leaks
in the water system, during
work breaks, and when not in
use.
• The cross-section of mains
connection lines must be no
smaller than rubber hose lines
with the designation H05RN8-F.
The line must be 10 m long.
The flexible lead cross-section
of the extension cord must at
least 2.5 mm
GB
.
2
IE
9

Publicité

Table des Matières
loading

Table des Matières