Post Mount J-Hook Installation
Locate the desired installation location
1
and align the rivet nubs on the back of
the J-Hook with the large hole of the
keyhole slots on the vertical angle posts.
Note:
When installing more than one J-Hook on the same
side of the vertical angle post, start with the lowest
position and install the next hook above.
6
Slide the J-Hook down to align the rivet
2
nubs with the bottom of the keyhole slots.