Testing; Precautions - MOOV FI500 Mode D'emploi

Masquer les pouces Voir aussi pour FI500:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

VII.

Testing

1.Inspection before use
A. Check installation of the entire heater and pipe connections
according to the pipe connecting drawing;
B. Check the electric wiring according to the electric wiring diagram;
and grounding connection;
C. Make sure that the main heater power switch is off;
D. Check the temperature setting;
E. Check the air inlet and outlet.
2.Trial
A. The user must Start the water pump before the heat pump, and turn
off the heat pump before the water pump, or the heat pump will be
damaged;
B. The user should start the water pump, and check for any leakage
of water; Power on and press the ON/OFF bottom of the heat pump,
and set suitable temperature in the thermostat.
C. In order to protect the pool heat pump, the heater is equipped with
a time lag starting function, when starting the heater; the blower will
run 1 minute earlier than the compressor;
D. After the pool heat pump starts up, check for any abnormal noise
from the heater.
VIII.

Precautions

1. Attention
A. Set proper temperature in order to get comfortable water
temperature; to avoid overheating;
lease don't stack substances that can block air flow near inlet or
B.
outlet area, or the efficiency of the heater will be reduced or even
stopped;
lease don't put hands into outlet of the swimming pool heater, and
C.
12

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour MOOV FI500

Ce manuel est également adapté pour:

Fi650Fi900Fi1100

Table des Matières