Polaris
Section 4. Installation
4.1
Plumbing Overview
•
The pump must be installed on the outlet side of the filter.
•
If installed on a dual equipment system with a heater,
introduce the booster pump downstream no less than
3' feet (1 m). This ensures that excessively heated
water is not passed through the booster pump.
•
If using solar heat, ensure that the booster is
equipped with an automatic override to shut off the
pump. This ensures that the pump will not operate in
a no flow condition during solar panel purges.
•
Plumb the booster pump upstream from any
chlorination or other sanitation systems.
Heater
To Dedicated
Cleaner Return Line
PB4SQ Booster Pump
For Single Body
Equipment Installations
Heater
PB4SQ Booster Pump
To Dedicated
Cleaner Return Line
For Dual Body
Equipment Installations
Figure 2.
Typical Equipment Layout
|
PB4SQ™ Booster Pump
Installation and Operation Manual
®
Filter
Check Valve
Filter
Check Valve
Salt Water Chlorination Cell
To Pool
•
Always use properly sized valves. Jandy
valves are recommended for best flow capabilities.
•
Use the fewest fittings possible.
If more than 10 suction fittings are needed, the
NOTE:
pipe size must be increased.
•
The piping must be well supported and not forced
together where constant stress will be experienced.
•
A dedicated return line is required.
Variable Speed Pump
Salt Water Chlorination Cell
To Pool
Variable Speed Pump
From Skimmer
To Spa
Page 7
ENGLISH
Pro Series
®
From Pool Drain