Shop for Power Metering products online at:
3
INSTALLATION INSTRUCTIONS
3.6
Installation of Voltage Lines
TO AVOID FIRE, SHOCK OR DEATH, make sure service is disconnected
before any connections are made.
Voltage connections must be made in accordance with NEC Section 240
and all other local electrical code requirements.
1. Connect 18 AWG min., 600 V min. insulated wiring for Line voltages and Neutral
to the appropriate locations in the breaker panel, in accordance with all national
and local electrical codes.
2. Route wires through the conduit if not already done.
3. Trim the wire to the appropriate length to avoid coils of excess wiring.
4. Strip wiring to approximately .300 inches if needed and connect to the appropriate
terminals. Wires should be tightened so that they are held snuggly in place, but do
not to over-tighten, as this may compress and weaken the conductor.
PowerMeterStore
www.
15
1.888.610.7664
.com