2.0 INSTALLATION
2.1 Termination Cap Framing
IMPORTANT: Termination framing MUST be level so the termination
cap is level upon installation. This is required so precipitation does not
build up inside the termination cap.
Find the desired location of exterior heat transfer kit termination. For
horizontal termination cap clearances, see Figure 2.3.
10"
(254mm)
½
13
"
(343mm)
Figure 2.1, Framing Dimensions
Heat Transfer Kit - Exterior #HTK-EXT R.5
2.2 Roof Termination Framing
If the #HTK-EXT will terminate on a flat roof, construct an enclosure
similar to the one shown in Figure 2.2.
12"
(305mm)
Figure 2.2, Rooftop Enclosure Framing