1.1 General information

For safety reasons it is important to read all of the en-
closed information
(Installation guide, Service manual, Spare parts, Operat-
ing instructions) before mounting this equipment.. In
addition, the legislation in force at the time of purchase
must always be considered in connection with the instal-
lation and mounting of this equipment, no matter the
contents of this manual. If there are matters of dispute
please contact your dealer.
This equipment is produced and tested by specially
qualified personnel, following approved instructions to
ensure our high level of product quality. After the prod-
uct is finished and tested it is manually inspected with
the ultimate test carried out just before the product is
released for shipping. To obtain our high level of quality
and long life we use stainless steel parts. These parts, in
defiance of our manual inspections may still have some
sharp edges, which can present a cut hazard. Therefore
it is advised always to use protective gloves and show
caution when installing the equipment.

1.2 Preparation

If the wall is made of bricks or concrete, the enclosed
screws and rawl plugs are usable otherwise you have to
make sure that the carrying capacity of the wall is suf-
ficient.
Note: The pipeline must be rinsed through before the
system is connected. See service manual
Note: Remove cover before the system is mounted on
the wall.
Note: The weight of the unit are listed in the Service
manual under the section "Specifications"
1.3 Placing/application
• Do not use the machine outdoors.
• The satellite must be placed in frost-free rooms only.
• Free space around the satellite: min 1000 mm.

1.4 Water supply

Water volume
Pressure
1,2 - 2,5 MPa (12 - 25 bar)
Max. temperature
The supply line must be sized so that it can supply the
minimum indicated pressure and water volume when
connected to this equipment. When dimensioning the
water supply, It is recommended to increase the available
volume with 15-20 % compared to the minimum require-
ments listed in the table.
Note:
EN
equipment will operate with water hardness exciding
this level however, descaling of pump system, injectors
and like must be expected depending on use pattern
and water quality. Futhermore, wear of the mechanical
parts will increase as well. If not supplied, filter should be
mounted.

1.5 Air supply

Air supply for the system is to meet the following specifi-
cations:
• Pressure
• Consumption 200 Nl/min.

1.6 Piping

The pipe system should be made of stainless steel pipes.
The pipe joints should be made in a way that makes
separation possible in case of e.g. repairs, movement or
similar.
Pipe connections
Water
Air
Note:
water supply immediately before the satellite and dirt
filter if any.

1.7 Assembly

Dimensions see fig.1
It is recommended to mount the system in an appropriate
height (approx. 1, 25 m above the floor) on brick or con-
crete wall. Tighten the satellite with the enclosed screws
and rawl plugs.
SE11
30 l/min.
70
C
o
Recomented water hardness 14 - 18 dH°. The
6 – 10 bar
SE11
3/4" DIN 2999
6 mm