Installation - Minebea Intec IE11357 Mode D'emploi

Table des Matières

Publicité

Installation

1
4
3
2
§ Disconnect equipment from power
before opening the relay box.
§ To open the relay box, remove the
sechs screws from the cover plate.
§ Installing the cable gland and cable:
– Prepare the cable opening by breaking
out the pre-punched M20 disk.
– Guide the enclosed cable gland
(M20 x 1.5) into the opening and
secure it inside the housing with the
counternut (1).
– Route the cable (2) through the cable
gland. Tighten the screw-down nut
(3) until the sealing clamp (4) forms a
slight ridge.
§ Mount the cable on the relay card in
accordance with the relevant wiring
diagram.
Relay Box IE11357
5

Publicité

Table des Matières
loading

Table des Matières