AFTER MACHINE USE
At the end of the work, before leaving the machine:
1.
Disconnect the brush in the following way:
the brush lifted, push the brush switch (5, Fig. B)
to on position "I"; after a few seconds, put the
switch back to off position "0", releasing the brush.
2.
Empty the tanks (5 and 6, Fig. H), following the
instructions in the previous paragraph.
3.
Perform the maintenance operations after the
machine use (see chapter "Maintenance").
4.
Leave the machine in a dry and clean place, with
brush and squeegee lifted or removed.
MACHINE LONG INACTIVITY
If you foresee that the machine will not be used for
more than 30 days, proceed as follows:
1.
Perform the operations described in the previous
chapter "After Machine Use".
2.
Disconnect the battery connector (25, Fig. C).
3.
Disconnect the positive battery terminal (+)
directly from the battery (+) pole.
FIRST PERIOD OF USE
After the first period of use (first 8 hours) it is necessary
to check that the fixing and connecting elements are
correctly fixed, that the visible parts are integral and
that there are no leaks.
SCHEDULED MAINTENANCE TABLE
Operation
Squeegee cleaning
Squeegee blade check (and replacement)
Brush cleaning
Tank and suction grid with float cleaning
Detergent filter cleaning
Battery charge
Lead battery (WET) liquid level check
Nut and screw tightening check
Brush electric motor carbon brush check or replacement
Suction electric motor carbon brush check or replacement
Drive motor brush (or carbon brush) check or replacement (*)
Grease drive shaft bearings (*)
(1): and after the first 8 working hours
(2): contact the Kent/Euroclean Service Center for these maintenance operations
(*): 20BT versions only
08812946(3)2003-08
INSTRUCTION MANUAL FOR USE AND MAINTENANCE
MAINTENANCE
The machine proper and safe operation is guaranteed
by a careful and constant maintenance.
The following table sums up the scheduled maintenan-
ce. The indicated periods can be subjected to varia-
tions according to working conditions. These must be
defined by the person in charge for the maintenance.
All periodic or extraordinary maintenance operations
must be performed by skilled personnel, or by an autho-
rized Service Center.
This Manual contains the Scheduled Maintenance Ta-
ble and describes only the easiest and most common
maintenance procedures.
Daily, after
machine use
"
"
"
"
WARNING!
The operations must be carried out with
the machine off and the battery discon-
nected.
Moreover, read carefully the instruc-
tions in the Safety chapter before per-
forming any maintenance operation.
REMARK:
For other maintenance procedures con-
tained in the Scheduled Maintenance
Table see the specific "Service Manual"
that can be consulted at the Kent/Euro-
clean Service Center.
Every six
Weekly
months
"
"
"
" (1)
Yearly
" (2)
" (2)
" (2)
"
11