5.3. SETTING UP THE GATE
Wait for the cement to set before starting this operation.
1.
Assemble the release levers on the support bracket, and fit the latter
on the pivot in the foundation box, also inserting the ball supplied
(Fig. 8).
Grease both the pivot and the ball.
Do not lubricate the release system for any reason.
2.
Prepare the guide bracket, as follows:
•
use a "U" profile with dimensions indicated in Fig. 9;
•
ascertain the correct location of the leaf on the "U" profile with reference
to the axis of rotation (Fig. 10a or 10b) ; seal the "U" profile on the post
side with a plate, as shown in Fig. 10a or 10b.
3.
Carefully weld the guide bracket to the support bracket (Fig. 11).
4.
Fit the gate into the guide bracket and fix the top hinge in place.
To ensure trouble-free operation, do NOT weld the gate leaf to the
guide bracket or to the support bracket.
5.
Manually verify whether the gate opens and closes completely and
smoothly, stopping at the mechanical travel stops.
5.4. INSTALLING THE OPERATOR
Fig. 8
1.
Open the gate leaf.
Place the operator on the fastening screws on the foundation box, and
2.
fix it by means of the nuts and washers supplied (fig. 13a and 13b).
In order to determine the exact position of the operator with the
levers for 110° and 140° opening, please refer to fig. 12. In any case
the operator pinion must be on the opposite side of leaves opening
direction.
Fig. 9
3.
Manually close the leaf and fit the driving levers supplied, as shown
in Fig. 13a.
Fig. 10a
In order to determine the exact position of the operator, gear plate
for 180° opening (Fig. 13b) and the required settings, please refer to
the instructions enclosed.
Fig. 10b
9
Fig. 11
Fig. 12
Fig. 13a
Fig. 13b