Aeration; Solution Temperature; Start-Up Instructions - Walter Bio-Circle Maxi 55D600 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SOLUTION TEMPERATURE

AERATION

The air pump located inside the RMU (please refer to item E on pages 5) should
always be heard and air bubbles should be visible at the surface of the liquid,
close to the pump support tube, when the machine is under power.
This built-in aeration feature is vital to the high-quality performance of the
bioremediation process.
TM
The Bio-Circle
factory set to maintain the solution at 41º C ± 1.5º (106°F ±2°). At this temperature
the bioremediation process is at its most efficient level, cleaning is faster and operator
comfort is at its best.
START UP INSTRUCTIONS
Please be sure to read and observe, the "SAFETY INSTRUCTIONS" at the
beginning of this manual.
www.biocircle.com
1. Remove the Bio-Circle™ Parts Cleaning System from its packaging and check
for any shipping damage. Should any be detected, DO NOT connect the machine
but report the damage to the transport carrier and to Walter Surfaces Technologies
Inc. The original packaging must be retained.
2. Open the sink. A sink holder bracket will maintain it in the open position
- Remove all packaging material around the unit and from inside the tank.(ex.:
from underneath or behind pump/heater coil)
- Ensure filter bowl (please refer to item D on Page 5) is tightened. (Hand tighten
only).
MAXI (55D600) incorporates a heater. The temperature control is
Detailed start-up instructions can also be found at
7
6

Publicité

Table des Matières
loading

Produits Connexes pour Walter Bio-Circle Maxi 55D600

Table des Matières