4. Technical data
Mains voltage: ...................................................... 220-240 V~ / 50 Hz
Max. current strength: ................................................................. 10 A
Protection type: .......................................................................... IP 44
Max. operating pressure:.......................................... 1.0 MPa (10 bar)
Max. temperature: ...................................................................... 55°C
5. Installation and start-up
Switch off the pump and pull the pump's mains plug. Remove the
existing output line on the actual pump. Ensure that you bleed the
pump correctly (refer to the pump's manual for further details). Screw
the connection adapter (Fig. 1 / Item 4) to the output line connector
on the pump (Fig 3). Fit the fl ow switch (Fig. 1 / Item 1) with the con-
nection thread (Fig. 2 / Item 5) to the connection adapter and secure
it to the connection adapter using the union nut (Fig. 4 / Item 10) (Fig.
4). The fl ow switch must be in an upright position, in other words the
connector for the pump (Fig. 2 / Item 5) must be at the bottom and the
GB
connector for the output line (Fig. 2 / Item 6) must be at the top. If it is
in any other position, the fl ow switch cannot work correctly. Raise the
non-return valve at the handle (Fig. 2 / Item 7) (Fig. 5) and carefully fi ll
the fl ow switch with the transport fl uid up to the bottom end of the th-
read on the pressure connector (Fig. 2 / Item 6) to prevent the system
running dry. Now screw the output line to the connector provided for
it (Fig. 2 / Item 6) on the fl ow switch and ensure that you seal the con-
nection properly, for example with Tefl on tape (not supplied). Connect
the pump's mains plug to the socket (Fig. 1 / Item 2) on the rear of the
fl ow switch. After checking all the connections and lines, connect a
consumer to the output line and open it so that any air in the output
line can escape when the transport process is started. Connect the
mains lead (Fig. 1 / Item 3) on the fl ow switch to an adequately fused
(at least 10 A) 220-240V ~ 50Hz safety mains socket with a ground
contact. The fl ow switch is now ready for use. Switch on the pump if it
Anl_ED_Schalter_PE_SPK7.indb 112
Anl_ED_Schalter_PE_SPK7.indb 112
- 112 -
27.10.15 13:11
27.10.15 13:11