Installation; Power Requirements - Promax GV-198 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TV generator GV-198

3 INSTALLATION

3.1 Power requirements

This equipment requires a mains power source of 110-125-220 or 230/240 V
AC 50 to 60 Hz. Mains operating voltage can be selected at the rear panel.
1.-
Pull out the fuseholder lid.
2.-
Set the proper fuse for the desired mains voltage.
3.-
Insert the fuseholder lid so the [ A ] pointer faces the desired mains voltage
display [ B ].
01/2004
To remove the fuseholder lid insert
a little screwdriver in the slot and
lift out.
Fuse
Fuseholder
lid
Figure 1.- Selection of mains voltage.
Page 9

Publicité

Table des Matières
loading

Table des Matières