The Second Wind Ultraviolet Germicidal 24 Volt Lamp is designed for 16,000
hours of continuous operation. After 16000 hours (approx 22 months) intensity
of the lamp inside the duct diminishes and should be replaced. Ballast# 010303
will display need for lamp change. Replacement of the lamp is recommended
by a qualified HVAC Service Technician.
1.
Disconnect electrical service and turn unit off.
2.
Loosen (2) screws holding faceplate and rotate faceplate to expose lamp
connection to ballast. Secure top screw to stabilize plate during service.
3.
Disconnect lamp connector from lamp base and remove plastic wing nut
from lamp base.
4.
Remove old lamp CAUTION: old lamp may still be hot!
5.
Replace the old lamp with the new lamp, making sure the new lamp is
clean and properly seats in rubber grommet at end of PCO module. Clean
the new lamp with an alcohol wipe if dirty or has fingerprints on it.
6.
Secure lamp to chassis with plastic wing nut.
7.
Attach lamp connector to the lamp base. Return faceplate to original install
location and secure screws.
8.
Reconnect unit to electrical service.
9.
If lamp does not immediately illuminate, turn off electrical service and unit. Reverse pin contacts in connect-
or by rotating connector 180 degrees
LAMP (MODEL 2124-Z)
LAMP (MODEL 2124-C)
BALLAST
UV lamps contain mercury like other household lamps and must be disposed of properly. State requirements
and recycling opportunities vary, go to www.lamprecycle.org for State Regulations & Contacts. Please con-
tact your county waste collection department for proper disposal details.
If a lamp is broken, do not use a vacuum cleaner to pick up the waste . Instead, sweep up the waste into a plas-
tic bag and seal. Contact your county waste collection department for proper disposal details.
If the unit does not work, check the following:
Electrical Supply/Wiring—Verify that the electrical service is operating correctly.
Ballast—If ballast LED does not illuminate, there is no power to the ballast or the ballast has failed and requires
replacement. Confirm power supply and proper transformer operation (if present). If power is proper and within
proper voltage (19-30V), contact supplier for replacement ballast
Transformer—If a transformer is employed to provide power to the unit (not provided by Second Wind), it
should be tested in accordance with instructions provided with unit when installed.
Lamp—Verify that the lamp is not broken and is properly seated in the lamp connector. To check this, follow
steps in the 'Lamp Replacement' section with one exception: you should not remove and replace the lamp. If the
lamp is broken read the 'Lamp Disposal' section of this manual. Other lamp failure notifications will be shown
on display LED on ballast
1082 SIPT
SF-1082LR-TC EVERY 2 YEARS
010303
USE GLOVES AND EYE PROTECTION
EVERY 2 YEARS
AS REQ'D