Installation checklist
• The dryer is plugged into a properly grounded outlet.
• All packaging material is completely removed and properly disposed.
• The dryer is level and standing firmly on the floor.
• The long drain hose is installed if you want water captured by the drying process
drained automatically.
• Start the dryer to make sure that it runs, heats, and shuts off.
• Run a TIME DRY cycle for 20 minutes to see if the HC information code is displayed. If
this is the case, contact a local service center.
• After installation, we recommend that you wait at least 1 hour before using the dryer.
Before using the dryer
• Make sure no accessory remains inside the drum.
• Plug in the power cord just before operating the dryer.
• Do not block the air inlet hole of the cooling grill at the front of the dryer.
• Do not place flammable objects near the dryer and keep the surrounding area clean.
• Keep the dryer level with the ground.
• Do not remove the adjustable levelling legs of the dryer. They are necessary to keep
the dryer level.
English 23