JETStream VIVA Instructions De Montage Et Mode D'emploi page 11

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Steps should be taken to ensure that builders debris does not enter the tube or valve during the course of construction.
The purpose of the non return valve is to prevent water spraying out of the air inlet fitting. The valve will only function
properly as long as no hair/debris or lime deposit accumulates within it.
Fit the supplied air inlet valves to the end of the air suction hoses. Push the hose nipple (32) of the valve (33) into the
hose and secure by means of the hose clips (34).
Fasten the pipe clip (35) with screw supplied to an adjacent wall.
PNEUMATIC SWITCH OPERABLE FROM POOL (ACCESSORY)
Turn gland nut (40) anto-clockwise in order to remove it together with blank sealing disc from wall fitting whilst ensuring
that the rubber sealing washer (42) remains inside the gland aperture in wall fitting (41).
Thread free end of the 10 m length of pneumatic tube (47) through the gland aperture from within the pool.
On the pneumatic switch is a short length of pneumatic tube (44). Thread this through the gland nut (40), soften end of
tube and fix to the free end of tube connector (42). Replace and tighten the gland nut (40), having ensured that tube
connector (45) is flush against the rubber sealing washer in the housing (41). Coil surplus pneumatic tube (44) around
rear end of switch assembly (43).
Push the switch assembly (43) into the wall fitting so that the outer flange (50) is in contact with the pool wall ensuring
that the pneumatic tube does not get crushed. Line up the countersunk holes in the switch assembly (50) with the
threaded holes in the wall fitting (41) and screw in the countersunk screws (47) without over-tightening.
MOUNTING THE CONTROL PANEL
The control panel should be installed within 10 m of the poolwall fitting. It must be fitted in a dry environment, not in the
pump chamber. If these conditions are not met, warranty claims will not be honoured.
The 10 m length of pneumatic tube (46) from the wall fitting should be cut to length and attached to the ,,T" connector
(48) beneath the control panel (49). The 10 m length of pneumatic tube should not be lengthened or extended beyond
18 m maximum.
Please consult appropriate wiring diagrams, three phase or single phase before construction work commences in order
that appropriate duct arrangements may be made.
A 30 mA earth leakage circuit breaker (R.C.C.B.) must be installed before the control panel.
All electrical work must be carried out by a qualified industrial electrical engineer in accordance with current l.E.E.
regulations.
11

Publicité

Table des Matières
loading

Table des Matières