BH SHIATSU S100 Instructions De Montage Et Utilisation page 30

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

D.2.4 Before fitting the the top panel, make sure to bring all of the heater connection cables through the side
panes on the sauna.
The top panel should be fitted so that the lights are above the door, Fig.15. Lift the ceiling panel a little and
connect the front and rear plugs at the top of the side panels, Fig.16.
Fig.15
Fig.16
D.3 Replacing the ceramic infrared heater.
Warning:
Only qualified person can replace the heater
D.3.1 Take the heater cover off using the screwdriver provided.
D.3.2 Take off the ceramic covers of tube and remove the connecters from two ends of the tube.
30

Publicité

Table des Matières
loading

Table des Matières