4.5
240V hard-wiring
1. Relocate the factory-installed jumper wires to join terminals 15 to 18, 16 to 17, and 12 to 19.
2. Insert the ground/bond wire to terminal 22 and the supply neutral wire into terminal 11.
3. Insert L2 wire into terminal 20.
4. Loosen terminal 19. Insert L1 wire into terminal 19 along with the jumper wire that connects to terminal 12
(Fig. 4-4).
5. Re-install the cover plate.
D x 1
Junction Box
Cover Plate
B
Inside
Appliance
4.6 securing and testing
1. Secure the appliance to the rough-in framing by installing 6 screws (supplied) through the metal brackets (Fig.
4-5).
2. Turn on the power supply and test all functions of the appliance (see "operation instructions" section).
note:
If any functions do not operate to the specifications of this manual, review wire configurations and/or call
Napoleon Customer Solutions at 1-866-820-8686.
3. Install finishing materials (see "finishing" section).
MATERIAL: CLASS IIA-1 PERMANENT LEXAN ADHESIVE LABEL, MINIMUM THICKNESS 0.1MM, TEM
Strain Relief
Outside
Appliance
A x 6
electrical information
240V AC
G
L2 L1
22
21
20
19
18 17
JUMPER WIRE LOCATIONS VARY FOR
120V AND 240V.
LES EMPLACEMENTS DU FIL DE DÉRIVATIONS
VARIENT DE 120V ET 240V.
Fig. 4-5
Fig. 4-3
L1 N
16
15
14
13
12
11
Fig. 4-4
W385-2366 / B
W415-1953 / C / 03.04.21
EN
19