Miles Industries Valor retrofire RA24ZC ZERO CLEARANCE KIT Instructions D'installation

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Approved for use only with Valor Retrofire Model RF24BN/P Insert
Please read this manual in conjunction with the RF24B heater Installation Manual
General Application
The RA24ZC Zero Clearance Kit with RF24B heater
may be installed in new wood frame construction with
type "B" venting.
The Zero Clearance Kit is also intended for applications
where an existing gas or wood burning fireplace is
being removed in whole or in part, without disturbing
the surrounding wall finish.
The zero clearance box may be roughed-in on its
own and the RF24B heater installed later.
The minimum cavity for installing the Zero
Clearance Kit is shown in the Framing Dimensions
diagram next page. Existing type "B" gas venting
may be utilized provided the integrity is intact.
Existing mantel clearances must conform to the
chart.
For visual reasons, the zero
clearance box is painted
black on the inside; it is
recommended to paint the
vent liner and gas line with
high heat paint after installing.
4000876-04
©2010, Miles Industries Ltd.
RA24ZC
ZERO CLEARANCE KIT
Installation Instructions
Kit Content
Overview

Publicité

Table des Matières
loading

Sommaire des Matières pour Miles Industries Valor retrofire RA24ZC ZERO CLEARANCE KIT

  • Page 1 Existing mantel clearances must conform to the chart. • For visual reasons, the zero clearance box is painted black on the inside; it is recommended to paint the vent liner and gas line with high heat paint after installing. Overview 4000876-04 ©2010, Miles Industries Ltd.
  • Page 2 Framing Dimensions Note: 29” x 33” minimum opening in combustible wall. 23” Rear width 29” Combustible oor and hearth approved 16” 4” dia. Mantel Clearances Stand-o s collar 33” 20” Front width 24-1/2” 24-3/8” 23-1/4” 5-1/4” 8” 7-5/8” to 7-1/4” 1225VFB Ventana Fret (Black) RA24TB Fret (Black) Gas line access...
  • Page 3 Mount the fret retainers to the insert prior to installing for RA24DS/FS Screens (other fronts have the retainers built in). Secure the vent plate using 2 screws. 2. Connect the gas line to the unit. ©2010, Miles Industries Ltd.
  • Page 4 Install Heat Shield and Convection Baffle 1. Place heat shield into ZC box through the notched cut-outs on each side at the top of box. 2. Place the tabs at the rear edge of the heat shield into the slots. Secure the heat shield using 2 screws on each side.
  • Page 5 4. Hook the front to the mounting brackets on the ZC box. It may be desirable for visual reasons to adjust the front-to-back position of the insert depending on which inner front trim is used and where the cast iron fret positions. ©2010, Miles Industries Ltd.
  • Page 6 Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication. Designed and Manufactured by / for Miles Industries Ltd. 190 – 2255 Dollarton Highway, North Vancouver B.C., CANADA V7H 3B1 Tel.
  • Page 7: Application Générale

    Pare-étincelles au choix : Foyer RF24BN/P RA24DS amovible RA24FS fixe 743FVI porte double 744FVI porte simple Base de foyer au choix : RA24TB traditionnelle RA24CV contemporaine RA24AV avant-garde Concept ©2010, Miles Industries Ltd.
  • Page 8: Dimensions D'encastrement

    Dimensions d’encastrement 8-3/4” à 10-3/4” Note : L’ouverture minimale dans un mur combustible est de 29” de haut sur 33” de large 23” Largeur arrière 29” Plancher et base de foyer combustibles homologués 16” Dégagements du manteau de cheminée Buse de Écarteurs 4”...
  • Page 9: Préparation De La Caisse À Dégagement Zéro

    2. Fixez le devant de la plaque d’évent au foyer à l’aide de deux vis. Montez les supports de base de feu avant d’insérer le foyer 3. Branchez la conduite de gaz à l’appareil. dans la caisse ©2010, Miles Industries Ltd.
  • Page 10: Installation Du Déflecteur De Chaleur Et Du Déflecteur De Convection

    Installation du déflecteur de chaleur et du déflecteur de convection 1. Insérez le déflecteur de chaleur dans la caisse à dégagement zéro en le guidant dans les encoches des coins supérieurs de la caisse. Insérez le déflecteur de chaleur en le guidant dans les encoches des coins supérieurs de la caisse Insérez les onglets dans...
  • Page 11: Installation De La Bordure

    être souhaitable d’ajuster la position du accrochez la base de feu sur foyer d’avant en arrière dans l’âtre selon l’espace les supports de la bordure. disponible, la bordure utilisée et la position de la base de feu. ©2010, Miles Industries Ltd.
  • Page 12: Pièces De Remplacement

    Parce que nous favorisons une politique de développement continu, certains détails de la présente publication peuvent varier. Conçue et fabriquée par / pour Miles Industries Ltd. 190 – 2255 Dollarton Highway, North Vancouver, BC, CANADA V7H 3B1 Tél. 604-984-3496 Téléc. 604-984-0246...

Table des Matières