Installation Requirements; Tools And Parts; Location Requirements - Jenn-Air 740-0712 Instructions D'installation Et Guide D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Parts

Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools Needed
Tape measure
Small, flat-blade screwdriver
#2 and #3 Phillips screwdriver
Level
Wrench or pliers
Parts Supplied
Gas pressure regulator/hose assembly set for 11" WCP LP
gas.
1 - "AA" size alkaline battery
20 lb LP gas fuel tank tray
12 screws (for installing 20 lb LP gas fuel tank tray, 90° brass
clamp/Natural gas regulator clamp)
Hardware packet
2 piece 90° brass clamp (for mounting 90° brass connector)
Allen wrench (for loosening control knobs)
Warming rack
Parts Needed
20 lb LP gas fuel tank
Parts Supplied for Conversion to Natural Gas
Natural gas conversion kit (which includes):
Natural gas regulator (marked "Natural Gas Regulator")
10 ft (3.0 m) PVC flexible gas supply hose with quick
connector
6 mm nut driver
Natural gas regulator clamp
2.05 mm Natural gas orifice for rotisserie/infrared burner
2.10 mm Natural gas orifice for infrared searing burner
Parts Needed for Conversion to Natural Gas
Gas line shutoff valve
½" male pipe thread nipple for connection to pressure
regulator.
LP gas-resistant pipe-joint compound
CSA design-certified outdoor flexible stainless steel
appliance connector (4-5 ft [1.2-1.5 m]) or rigid gas supply
line as needed.

INSTALLATION REQUIREMENTS

Pipe wrench
Scissors or cutting pliers
(to remove tiedowns)
Noncorrosive leak-
detection solution

Location Requirements

WARNING
Explosion Hazard
Do not store fuel tank in a garage or indoors.
Do not store grill with fuel tank in a garage or indoors.
Failure to follow these instructions can result in death,
explosion, or fire.
WARNING
Fire Hazard
Do not use grill near combustible materials.
Do not store combustible materials near grill.
Doing so can result in death or fire.
Select a location that provides minimum exposure to wind and
traffic paths. The location should be away from strong draft
areas.
Do not obstruct flow of combustion and ventilation air.
Clearance to combustible construction for outdoor grills:
A minimum of 24" (58.0 cm) must be maintained between the
front of the grill hood, sides and back of the grill and any
combustible construction.
A 24" (58.0 cm) minimum clearance must also be maintained
below the cooking surface and any combustible construction.
Rotisserie (accessory)*
If you equip your grill with a rotisserie, a 6" (15.2 cm) minimum
clearance is needed for the rotisserie motor.
A grounded, 3 prong outlet located to the left of the grill is
required.
*See "Assistance" section to order.
5

Publicité

Table des Matières
loading

Table des Matières