Télécharger Imprimer la page

Spectrum Industries STEAM Roller Teacher Station Guide De Démarrage Rapide page 5

Publicité

7
Install 2nd right tote bin panel
Note: The 2nd right tote bin panel attaches to the left
tote bin panel with (4) #8 x 3/8" PHSM screws only. It
does not fasten to the worksurface or base panel.
#8 x 3/8" PHSM
(4 required)
2nd right
tote bin
Left tote
panel
bin panel
9
Install handle
1/4-20 x 40mm JC Bolt
(2 required)
#14 x 7/8" PHSM
(4 required)
8
(4 required)
Handle
1/4-20 Keps nut
(2 required)
Attach 2nd left tote bin panel
2nd left tote
bin panel
#14 x 7/8"
PHSM
4mm
0192268 Page 5 of 8

Publicité

loading

Ce manuel est également adapté pour:

55546