Toto TSMA Manuel D'installation Et D'utilisation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IMPORTANT: For proper installation and smooth operation, the valve must
be level and square to the finished wall.
• Install the valve so that the outside surface of the finished wall will be
between the Max and Min markings on the plaster guard.
• Make sure the valve is installed with the small arrow pointing in the
direction of the water flow.
• Dashed pipework and fittings shown are not included.
The plaster guard should remain in place until you are ready to install the trim.
OUTLET
ARROW MUST
POINT IN
DIRECTION OF
WATER FLOW
MIXED WATER
INLET
INSTALLATION PROCEDURE
2-1/2" [65mm] MIN.
3-3/4" [95mm] MAX.
4
FINISHED WALL
SURFACE
MIN./MAX.
MARKINGS

Publicité

Chapitres

Table des Matières
loading

Table des Matières