- en -
Dear customer
Thank you very much for choosing a weka product.
Read these instructions through completely before assembling your product in order to avoid errors in
assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your weka product has been
delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables you
to check that all the individual parts are present. It should be retained along with the proof of purchase.
Any complaints which may arise can probably be easily rectified with this list. The item numbers on the
packing list do not correspond to the item numbers in the following assembly instructions.
We recommend that 3 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be minor
deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
RECOMMENDATIONS
Please drill pilot holes for all screw connections to avoid damaging the wood. The following
symbol in the instructions will indicate when this is necessary:
Protect the wood from hours of direct sunlight and moisture.
Wood is a natural product. Fluctuations in colour, knots and cracks are normal and have no influence on
the statics.
A prerequisite for successful assembly, is the anchoring of the studs in the concrete foundation using H
stud supports. The stud supports are available as weka accessories for an additional cost.
NOTE!
The dimensions are to be checked regularly during the course of the entire installation!
A foundation plan can be obtained from your specialist dealer!
In order to facilitate the precise alignment of the H anchors, mark the necessary post clearances on a
piece of guide wood and fix the anchors in place with screw clamps
Then suspend the H anchors in the base holes already prepared. A minimum clearance of 2 cm is to be
maintained between the upper edge of the foundation and the upper strut.
After the holes have been filled with B25 concrete, the foundation must be allowed to set for at least 3
days.
Wood protection
The product is made from natural timber, for which regular and adequate wood preservation measures are
obligatory. Please contact a wood preservation expert for information on professional preservation
measures.
Wood preservation is to be carried out by the customer at his own risk. No guarantee can be given in the
event of wood preservation not carried out in accordance with the instructions. Please also note the
provisions relating to this in our guarantee. We wish you much pleasure with your wood product.
Techn. Änderungen vorbehalten!
+
Alle Maßangaben sind ca. Maße.
5
Copyright HRB 3662