INSTALLATION INSTRUCTIONS
INSTALLATION - VENTED TO THE OUTSIDE
1. INSTALLATION:
Remove the structure from the packaging
and remove the 2 screws A to separatethe
upper part from the lower part (Fig.1).
- Position hole template on the ceiling pay-
ing attention that the arrow is positioned
on the same side as the appliance controls
(Fig.2).
Make 4, Ø8 holes in the ceiling and drive
in 3 screws without completely tightening
them. Pay attention not to insert the screw
into the hole marked with an X on the hole
template (the screws and expansion plugs
must be suitable for the type of wall).
- Take the upper part of the structure B
(Fig.3) and insert the 3 slots onto the 3
screws that are not completely tightened.
Rotate slightly to fit (Fig.3).
Drive in the fourth screw X and tighten the
remaining 3 to allow definitive blocking of
the upper part ofstructure B.
- Take the lower part of the telescopic
structure C and insert it into the upper
structure B (Fig.4).
Adjust the height and block it using the 8
screws G that are supplied (Fig.5).
- Fix the flexible pipe to the prepared air
evacuation hole (Fig.6).
- Take the upper chimney piece and fix it to
the structure using the 2 screws A (Fig.7).
Join the lower chimney piece with the up-
per one and fix it carefully using adhesive
tape L (Fig.8).
- Screw the 2 screws O, max 3 mm (Fig.8).
Insert the exhaust unit inside the structure paying attention that the screws O, hook into
the slots in the lower part as indicated in (Fig.9). Drive in the 6 screws N (supplied) and
tighten the 2 screws O (Fig.9).
- Fix the air evacuation pipe H (not supplied) onto the connection flange F (Fig.10).
- Remove adhesive tape L and rest the lower chimney piece above the cooker hood
(Fig.11).
Limited to installation on plasterboard walls: make sure that the screws are fixed to the
Fig.1
Fig.2
- 9 -
X
B