Heating Priority Connections Single-Phase Pump - Hayward EcoPac Powerline Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 3
6. APPENDICES (continued)

6.2 Heating priority connections Single-Phase Pump

Power supply
230V / 50Hz
Single-phase pump
Output 230V
Filtration pump
servo control 20A max
Outside the filtration range, the water
temperature needs to be checked by the regular
starting of the filtration pump (15 minutes every
2 hours). If the heat pump is needed during this
checking period, it will start up and retain the
heating priority.
21

Publicité

Table des Matières
loading

Table des Matières