Installation Instructions – Archeon
INSTALLATION
Tools Required
9/16" socket or wrench, #2 Phillips head screwdriver,
flathead screwdriver, and electrical wiring tools as needed.
1.
With housing lying on a smooth, soft surface open the
access door by rotating the front door latch 1/4 turn.
2.
The door may be removed by opening approximately
120° and lifting off the hinge and by disconnecting the
green wire lanyard.
3.
Using a 9/16" socket, loosen the pipe clamp bolts (2)
enough to allow mounting arm (not included) to slide
onto leveling steps. (Figures 1 & 2)
N
ote:
A bird guard is provided pre-cut to accommodate
1-1/2" diameter mounting arms. When using larger
diameter mounting arms, remove the punch out
section of the bird guard. (Figure 3)
4.
If using a 1-1/2" pipe, remove the clamp bolts and
flip clamp so that pipe size is visible from the top.
The clamp must be reversed for the smaller pipe size
option. (Figure 2)
5.
Lift the housing into place and position end of mounting
arm onto leveling steps so that housing is level.
(Figure 4)
Care must be taken so arm does not inadvertently
N
ote:
strike internal components.
6.
Using a 9/16" socket, tighten the clamp bolts to
16-18 ft-lbs.
Door Latch
(2) Bolts 3/8"
(1) Pipe Clamps
Figure 1.
2
COOPER LIGHTING SOLUTIONS
Nano
TM
Bird Guard
Leveling Steps
IB521014EN
Installation instructions
(2) Bolts 3/8"
(1) Pipe Clamps
Figure 2.
Figure 3.
Install Direction
Figure 4.
Bird Guard
Leveling Steps
Cutout for Larger
Diameter Arm