Connecting The Supply Lines To The Device; Attaching The Clip-On Ferrite Core - TCi luna Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
5.1

Connecting the supply lines to the device

Before installing the device in the recessed housing, all required supply lines must be
connected according to this diagram. Please ensure that the power supply is connected
correctly. The correct connection plug is included in your delivery.
Reset
Ludwig-Rinn-Straße 10-14 • D- 35452 Heuchelheim/Gießen • Phone: +49 6 41-9 62 84-0 • Fax: +49 6 41-9 62 84-28 • www.tci.de
8 / 15
Topside
LAN/(PoE)*
24 V DC
Reset
*optional
Connectors panel
5.2

Attaching the clip-on ferrite core

Before inserting the device in the recessed housing, attach the supplied clip-on ferrite
core to the power supply cable as shown in the figure below. This is absolutely necessary
in order to achieve class B protection.
Supplied clip-on ferrite core
Ludwig-Rinn-Straße 10-14 • D- 35452 Heuchelheim/Gießen • Phone: +49 6 41-9 62 84-0 • Fax: +49 6 41-9 62 84-28 • www.tci.de
9 / 15

Publicité

Table des Matières
loading

Produits Connexes pour TCi luna Série

Ce manuel est également adapté pour:

Luna7-vi.r3

Table des Matières