Télécharger Imprimer la page

Telcoma T201 Mode D'emploi page 67

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
GB
The same function can be obtained by pressing and holding down the STOP/PROG. button, momentarily short-circuiting
6 - Press the STOP/PROG. button again.
8 - When the desired pause time is up, press the STOP/PROG. button again. Led L1 will go out, signalling the end of the procedure.
ADJUSTING THE POWER
According to EN Standard 12445, each automation must pass the impact tests measured with the appropriate instrument .
be mounted, such as a sensitive edge on the moving edge of the gate.
SOFT START
The soft-start function ensures that the start of movement is gradual, thereby avoiding jerks to the automation system. This
function may be cut out by inserting a jumper Jp1 (det. 18 of Fig.1).
CAUTION!
Cutting out the soft-start function automatically cuts out motor power control. In this case the motors should have
their own means of control (e.g. mechanical clutch).
TRIAC TEST
The control unit T201 controls the motors through the TRIAC. This component is essential to the system operation and
safety. If there is an anomaly, the control unit locks and the gate open indicator light blinks slowly.
NOTE:
Should the motors be incorrectly connected or the anti-crushing card MAS200 is not connected the TRIAC fails safe.
OPEN GATE INDICATOR LIGHT FUNCTIONS
The open gate indicator light shows the status of the gate by means of a series of signals.
These signals may be summed up as follows:
- Light off = gate closed
- Slow blinking light = gate opening
- Fast blinking light = gate closing
- Light with double blink = gate open in pause phase
- Light on = gate open in STOP phase

Publicité

loading