EAA
GB
Procedure
X
The aluminium pipe is 1.6 m in length on
delivery. The pipe can be shortened at the
open end if necessary. We recommend
adapting the length of the pipe so that the
tool holder
[1-1]
at forehead height. Always deburr the
aluminium
pipe
length!
X
Remove the rear panel of the EAA.
X
Grease the bottom section of the alumin-
ium pipe and slide into the Y-piece on the
EAA
[5-8]
up to the stop.
X
Tighten the two screws
per clamp to a tightening torque of 6 Nm.
The EAA is now seated securely on the
aluminium pipe.
X
Secure the bracket
the four holes [9-1]. Use fasteners suit-
able for the relevant building material
(e.g. tie rods, dowels).
Skip to chapter 8 "Connections in the EAA".
8
Connections in the EAA
8.1
Connecting the control cable
X
Wind the excess cable onto the holder
10].
X
Place the flat seal supplied
the cable connector
X
Insert the contact box
ble connector
[5-2]
[10-3].
X
Secure the control cable under the strain
relief on the EAA [5-3].
8.2
Connecting the mains cable
X
Wind the excess cable around the ridged
section [5-6].
X
Place the flat seal supplied
the contact box
[5-7]
X
Insert the contact box
ble connector
[5-7]
[10-4].
X
Secure the mains cable under the strain
relief on the EAA [5-4].
X
Plug the mains cable on the EAA into an
earthed socket with a 16 A fuse.
Exception: If the connected dust extrac-
tor is from another manufacturer, a differ-
ent configuration may be more appropri-
ate - see chapter 9.1 "Mobile dust extrac-
tor".
22
on the EAA is positioned
after
cutting
[5-9]
on the grip-
[9-2]
to the ceiling via
[10-1]
[5-2]
in the EAA.
[10-2]
into the ca-
and tighten the screw
[10-6]
in the EAA.
[10-5]
into the ca-
and tighten the screw
L On country versions GB, CH and DK, the
plug on the mains cable for the EAA/ASA
must be removed and replaced with the
accompanying rewirable plug. Note: only
trained and qualified electricians are au-
thorised to perform this work!
8.3
Connecting the compressed air
to
line
L Applies only for ASA mounting and ceiling
installation.
X
Cut the grey compressed air line to the
correct length.
X
EW versions: Guide the air hose through
the housing
tor
[11-3]
2].
X
EW/DW versions: Slide the grey air
hose onto the hose connector at the
maintenance unit inlet
screw clamp [7-2].
X
Secure the compressed air line and the
mains power and control cable to the alu-
minium pipe [12-2]using the three grip-
per clamp supplied [12-1].
X
Insert the end of the blue hose into the
[5-
connection[5-1]
through the opening on the housing.
over
X
Once you have attached all the connec-
tions inside the EAA, mount the rear panel
on the EAA.
X
Push the blue air hose onto the elbow
piece
[2-5]
8.4
Mounting the hose holder
The hose holder is used to store consumable
materials and hoses. Attach the two hose
holders to the rear panel of the EAA (see Fig.
[13]).
over
X
Secure the hose holder
ing an Allen screw
[13-3]
into both holes using the Allen key
[13-1]
supplied.
X
Secure the rear panel to the EAA using the
screws supplied.
9
Connecting the dust extrac-
tor
A mobile dust extractor or the stationary
TURBO extraction system can be used to ex-
tract dust.
[11-1]
onto the hose connec-
and close the screw
[7-3]
and close the
and guide the hose
on the maintenance unit.
[13-4]
[13-2]
with washer
clamp[11-
by screw-