IME Nemo D4-L+ Mode D'emploi page 18

Masquer les pouces Voir aussi pour Nemo D4-L+:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Nemo D4-L+
1.1
Resets
Possibility to reset the performed counts
1.1a
Partial Active Energy
Reset no (no) or yes (YES)
selects no or YES
confirms
1.1b
Current Max. Demand
Reset no (no) or yes(YES)
selects no or YES
confirms
1.1c
Power Max. Demand
Reset no (no) or yes(YES)
selects no or YES
confirms
1.1d
Run Hour Meter
(working hours and minutes)
Reset no (no) or yes(YES)
selects no or YES
confirms
6
1.2
Connection
selects the connection
Confirms
Select the desired connection and scrupulously respect the linked wiring diagram.
The selectable wiring diagrams are:
Symbol
Line
Load
1N1E
Single-phase
3-1E
3-phase 3 wires
Balanced
3N1E
3-phase 4 wires
Balanced
3-2E
3-phase 3 wires
Unbalanced
3-2E
3-phase 3 wires
Unbalanced
3-2E
3-phase 3 wires
Unbalanced
3-3E
3-phase 4 wires
Unbalanced
3N3E
3-phase 4 wires
Unbalanced
1.3
Power Demand
Combined power:
activa (W), reactiva (VAr), apparent
selects power
confirms
1.4
Current delay time and average power
Selectable delay time:
5, 8, 10, 15, 20, 30, 60 minutes
The selected time is valid both for the current and the average power
selects the time value
confirms
n°CT external
Wiring
-
1
S 1000/305
1
S 1000/357
1
S 1000/358
2
S 1000/306
2
S 1000/307
2
S 1000/308
3
S 1000/309
3
S 1000/310
(VA)
03/18 E02 10783522 WEB E cod.MF6HT...
Connection
Aron L1 - L2
Aron L1 - L3
Aron L2 - L3

Publicité

Table des Matières
loading

Table des Matières